”
1. Equipment floor plan, installation foundation, water/gas pipeline, power cable, control cable foundation construction drawing.
2. KGPS thyristor inverter instruction manual, equipment maintenance guide, fault judgment and troubleshooting guide;
3, GTR series diathermy furnace instruction manual, load sensor debugging parameter guide
4. Equipment safety operation procedures
5, the main control board line block diagram, schematic
6, the external console wiring diagram
7. Instructions for major purchased parts;
8, PLC control schematic diagram, ladder diagram;
9, equipment inspection certificate factory packing list
The above technical documents concerning technical secrets shall be kept confidential by the manufacturer.
Installation, commissioning and acceptance
1. Installation: The buyer shall clean the site according to the requirements of the supplier's drawings, lay the water and electricity pipelines, and place the equipment in accordance with the construction drawings provided by the supplier before the complete equipment arrives. The seller is responsible for the installation and connection of water, electricity and gas pipelines inside the complete equipment.
2. Commissioning and acceptance: After the installation of the complete set of equipment is completed, the seller is responsible for the whole machine debugging, according to the relevant provisions of the technical agreement, namely the heating temperature, temperature difference, tact time and other major technical indicators for acceptance; in accordance with the indicators agreed in this technical agreement Then the final acceptance.
Before the equipment is shipped from the factory, the user can send personnel to the supplier's site for pre-acceptance.
After sales service
1. Warranty period: The warranty period is one year. The equipment failure during the warranty period starts from the date of receiving the notification (subject to the fax), and the reply is given within 4 hours. Within 48 hours, the maintenance personnel must rush to the scene to freely troubleshoot.
2. Technical training: Before the delivery of the equipment or during the commissioning period, the seller is responsible for technical training for the on-site operation and maintenance personnel of the buyer. The training time is not less than 10 hours. All training is free and provides relevant technical information. The buyer can master the operation essentials and can eliminate common faults.
3. Accessories: Provide accessories at preferential prices.
4, special warranty: the main control board warranty for three years.
Total equipment price: 422,000 yuan