” On-site working conditions of round steel quenching and tempering production line -songdao induction heating equipment manufacturer
On-site working conditions of round steel quenching and tempering production line 
Author:admin time:2019-08-24 09:10

1. Working environment :

1.1. Working environment temperature: 5 °C ~ 40 °C.

1.2. Working environment humidity: ≤ 90 %.

1.3. Air pressure: 0.6 — 0.8Mpa .

1.4. Transformer primary provides three-phase AC6KV ± 10 % , 50Hz .

5 input power: 3000 KVA .

1 . 6 output voltage: 500V , 500V .

7 water cooling equipment: According to the selected power of 1500 kw, the user should choose the FL- 2 000B P Feng Shui cooler.

1 . 8 quenching liquid cooling equipment: According to the cooling capacity, the equipment FL - 3000BPT feng shui cooler is selected . Flow rate ≥ 250 tons / hour.

 

 


TEL
15038554363 18037961302