”
cooling system
We use the FL - 2000BP wind-water cooler of Wuxi Ark to cool the newly added 1500KW furnace;
Quenching liquid cooling system
We use Wuxi Ark's FL - 3000BPT type wind---water cooler;
Pneumatic mounting
In order to facilitate the work and neat appearance, two sets of cylinder mounting accessories have been specially designed for the pneumatic installation frame and steel structure. Quenching liquid automatic sprinkler system
We use a two-stage gas mist spray system, a 壹-stage water spray system, and a 壹-stage pneumatic spray dry system. All adjustments are completed by the industrial computer and the electric proportional control valve; and equipped with a manual control valve;
Quenching liquid collection system
We use the online collection tank to match the corresponding quenching fluid collection tank. An impurity filter collection box that can be easily cleaned is installed in the collection tank.
Anti-snap system
We use a speed measuring device between the two roller tables to prevent the tube;
Hardness system
We use Beijing Times TL - 160 portable Leeb hardness tester. This system is installed at the tail of the receiving gantry. All signals of this system can be uploaded to the industrial computer for printing and recording.
Voltage stabilization system
We use the method of detecting the grid voltage. When the grid voltage changes, the output power of the intermediate frequency power supply is automatically adjusted to ensure the stability of the heating temperature. In addition, when the intermediate frequency power supply changes ±10% of the grid voltage, the intermediate frequency voltage changes. Only 1%.
Transformer selection:
According to the total power requirements of the equipment, we choose 3000KVA rectifier transformer. According to the harmonic requirements of the power grid, we use △/△, Y-11 type transformer, the secondary capacity of the transformer is 1200KVA, 1800KVA, so the harmonic component injected into the grid can not be Excess