1, general project
1) to prevent theft: To prevent unauthorized use of installed wiring, piping materials and construction tools, hoping Party to provide a storage area, if stolen will be party liability.
2) Natural disasters: Damage to machinery and equipment caused by natural disasters such as earthquakes and floods after the induction melting furnace arrives at the site is not the responsibility of Party A.
3) Safety: Party A shall be responsible for the safety of the equipment and operators during the project .
4) Insurance: Party A shall be responsible for all procedures for the application for labor insurance of Party A's instructors and operators .
5) Design conditions:
(1) This specification is a configuration that fully considers the efficiency of the furnace to be used to design the induction melting furnace and the intermediate frequency power supply .
(2) In the design process , please contact our design staff in time due to the need to change the size or configuration of the relationship between the workshops of Party A.
(3) The arrangement of the induction melting furnace shall be carried out with reference to the layout drawings provided by Party A.
(4) In the case of design change due to the reason of Party A, it may affect the amount of the quoted price. For example, when the configuration needs to be changed significantly (the electrical room is changed from the second floor to the basement or the furnace and the electrical The distance between the rooms becomes longer, etc.) will be negotiated separately.
2. Specific division of civil engineering and installation engineering
class | project | Party A | Party A | Remarks |
Installation work | Hoisting of incoming induction melting furnace | ◎ | ||
Crane preparation and operator | ◎ | |||
Installation and adjustment of the furnace body and its parts | ◎ | Installation guide | ||
Tilting device installation and adjustment | ◎ | Installation guide | ||
Installation and adjustment of power supplies and their components | ◎ | Party A guides installation | ||
Installation and adjustment of cooling water equipment | ◎ | |||
Wiring engineering | High-voltage power supply introduction engineering (combination materials and terminal treatment) | ◎ | To the transformer high voltage line end | |
Low-voltage power supply introduction project (including materials and terminal treatment) | ◎ | To the line side of the rectifier cabinet | ||
Main circuit wiring project (including materials) | ◎ | To the rectifier cabinet busbar | ||
Control circuit wiring engineering (including materials) | ◎ | |||
Cooling water system wiring project (including materials) | ◎ | |||
Ground wire burying and electrical room grounding | ◎ | |||
Ground wire wiring (electrical room) | ◎ | |||
Piping engineering | Primary cooling water circuit piping project (including piping and support) | ◎ | Furnace cooling tower piping | |
Secondary cooling water circuit piping project (including piping and support) | ◎ | Medium frequency power supply cooling tower piping | ||
Primary cooling water supply pipe project (including piping) | ◎ | To all cooling tower inlet lines | ||
Hydraulic circuit piping engineering (including piping and support) | ◎ | |||
Cooling water pipe cleaning, pressure test | ◎ | |||
Hydraulic pipe cleaning, pressure test | ◎ | |||
Civil engineering | Furnace foundation engineering (including shrink-free cement for furnace seat fixing) | ◎ | ||
Induction melting furnace working platform and ladder | ◎ | |||
Furnace pit and protection net structure | ◎ | |||
Electrical room, plant and foundation construction | ◎ | |||
Wiring part for wiring and piping | ◎ | |||
Lighting equipment and other equipment | ◎ | |||
Ventilation fan protection window and rainproof project | ◎ | |||
Preparation of the cooling pump house | ◎ | |||
Cooling tower reservoir preparation | ◎ | |||
Electrical indoor drain | ◎ | |||
Emergency generator room | ◎ | |||
Furnace sintering | Coil refractory mud drying operation | ◎ | ||
Furnace construction (insulation posting and furnace construction) | ◎ | |||
Furnace guidance (insulation posting and furnace building) | ◎ | |||
Furnace lining sintering operation, guidance | ||||
Preparation of melting materials for sintering | ||||
other | Engineering power, water, sand, cement | ◎ | ||
The compressed air is 0.6mpa or more. Flow rate above 2m3/min | ◎ | |||
Tool storage place | ◎ | |||