”
a) Test of electric shock protection measures;
b) Furnace assembly size inspection;
c) detection of manufacturing quality of induction coils;
d) Measurement of clearance between induction coil and furnace shell;
e) Insulation resistance measurement of induction coil and furnace shell;
f) Insulation resistance measurement between induction coil and magnetic choke;
g) Insulation melting furnace insulation withstand voltage test;
h) inspection of hydraulic systems;
i) tilting furnace operation test of tilting furnace transmission mechanism;
j) Hydrostatic test of induction coils;
k) Testing of safety interlocking and alarm systems (including inspection of furnace alarm devices);
l) Inspection of supporting parts, including inspection of model, specifications, and factory qualified certificates;
m) Inspection of scope of supply;
n) packaging inspection;